Skip to content

Opening book details…

About this document

L02 Zone 1 Air System Sizing Summary by siva anand is a document available to read on EtoBox.

This document provides an air system sizing summary for L02 Zone 1 in Bangalore, India. It summarizes that: 1) The central cooling coil is sized to handle a total load of 157.3 kW occurring in June at 1600, with a sensible load of 141 kW. 2) The zone requiring the most airflow is Zone 1, with a maximum cooling sensible load of 113.1 kW and design airflow of 11911 L/s. 3) The supply fan is sized for an actual maximum airflow of 12279 L/s, requiring 28.38 BHP of fan motor power and 22.51 kW of fan motor

Author
siva anand
Language
EN