Skip to content

Opening book details…

About this document

ExxonMobil Loadout Standards Update by Dhanush is a document available to read on EtoBox.

This document summarizes changes made in the February 2003 Revision 2 of standard GS 00-05-21: Loadout and Tiedown. Key changes include clarifying that the transporter, not fabricator, provides tie-down materials; adding a requirement for the erector to witness testing; and specifying that tiedown drawings must be provided 45 days before loadout. The summary also notes two positive changes to the fabricator

Author
Dhanush
Language
EN