About this document
Precast Pile Length Change Approval by Nashaat Dhyaa is a document available to read on EtoBox.
1) A contractor requested approval from the company to change the lengths of precast pile sections for foundations of spherical gas storage tanks, where the bottom section was fabricated at 12m instead of the specified maximum of 9m. 2) The contractor argued this minor deviation would not compromise structural integrity or performance, as pile joints can be located farther below the surface, and welding would be reinforced. 3) The company accepted the contractor
- Author
- Nashaat Dhyaa
- Language
- EN