Skip to content

Opening book details…

Can I read Technical Batch Data Report New 7.0 on EtoBox?

Technical Batch Data Report New 7.0 by infrazaf is a document available to read on EtoBox.

What is Technical Batch Data Report New 7.0 about?

The technical batch data report for Plant ID 002 on 17-02-2026 details the production of M50 OPC concrete with an ordered and produced quantity of 6.00. It includes batch details such as material quantities, moisture levels, and error percentages across multiple batches, with a total of 14 batches processed. The report concludes with the total batched quantities and the batch end time of 3:42:00 PM.

Author
infrazaf
Language
EN

More by infrazaf

Browse all works by infrazaf