Mechanical Installation and Equipment Costs by Panji Trisna is a document available to read on EtoBox.
This document outlines the work breakdown structure (WBS) for the mechanical and installation aspects of a pectin production plant. It includes a list of key tasks such as surveying equipment needs, installing production equipment, creating procedure cards and maintenance schedules. The WBS also provides a detailed cost breakdown for various equipment, materials, and infrastructure items needed for the plant including tanks, pumps, conveyors and more, with quantities, unit costs and total costs specified. T