Skip to content

Opening book details…

About this Engineering article

Scheduling Hydro Power Systems with Restricted Operating Zones and Discharge Ramping Constraints by Xiaohong Guan, ; Svoboda, A.; Chao-An Li, is a Engineering article available to read on EtoBox.

It is typically read by researchers, students, and practitioners in Engineering.

Author
Xiaohong Guan, ; Svoboda, A.; Chao-An Li,
Publisher
IEEE; Institute of Electrical and Electronics Engineers; Institute of Electrical and Electronics Engineers (IEEE) (ISSN 0885-8950)
Published
1999
Language
EN
Field
Engineering (Physical Sciences)

More by Xiaohong Guan, ; Svoboda, A.; Chao-An Li,

Browse all works by Xiaohong Guan, ; Svoboda, A.; Chao-An Li,