Skip to content

Opening book details…

Can I read Bakau Piling Method Statement for Drain on EtoBox?

Bakau Piling Method Statement for Drain by Wr Ar is a document available to read on EtoBox.

What is Bakau Piling Method Statement for Drain about?

This document is a method statement from C & V Engineering PTE LTD for bakau piling works to construct a 1500mm RC box drain. It was submitted to the Land Transport Authority for review. The QP(Supervision) accepted the contractor

Author
Wr Ar
Language
EN

More by Wr Ar

Browse all works by Wr Ar