The discussion provided guidance on calculating material quantities for various construction works: 1. For rendering, the cement-sand mortar ratio is 1:3 and the quantities needed per 10m2 are 0.06m3 of mortar containing 27.56kg of cement and 0.06m3 of sand. 2. For terrazzo tile flooring with a 2.5cm thick 1:4 mortar bed, 10.12kg of cement and 0.0275m3 of sand are required per m2. 3. For cement screed flooring at 2.5cm thick, a 1:3 mortar mix requires