About this document
Meeting Minutes on Instrument Layout Issues by bhujakhia_748657110 is a document available to read on EtoBox.
The meeting on June 15, 2007, discussed the need for improved air conditioning in the CO&CCP Laboratory to accommodate sensitive analytical instruments. Concerns were raised about the current lack of air conditioning on the first floor, which affects the operation and longevity of the equipment. The DGM (QA&TD) committed to requesting an assessment for suitable air conditioning solutions for the first floor and asked for a layout plan to be prepared.
- Author
- bhujakhia_748657110
- Language
- EN