Can I read Pulau Indah CCPP Cable Inspection Report on EtoBox?
Pulau Indah CCPP Cable Inspection Report by Rimzan Narbmi is a document available to read on EtoBox.
What is Pulau Indah CCPP Cable Inspection Report about?
The document is a Field Inspection Notification (FIN) for the installation inspection of power cable terminations at the Pulau Indah CCPP, issued on July 23, 2023. It details the inspection of cable installations scheduled for July 24, 2023, at the GCB (U1) platform and includes references to relevant documents. The inspection involves multiple parties including the sub-contractor, contractor
- Author
- Rimzan Narbmi
- Language
- EN