About this document
De-Butanizer Heater Duty Analysis by Ahmed is a document available to read on EtoBox.
This document provides specifications for a 48-H-1 de-butanizer bottom fired heater with a duty of 5.168 MM Kcal/hr, including notes on symbols, number of burners, damper access, fuel gas sampling, and heater shutdown logic to be designed by the supplier and implemented in the plant DCS.
- Author
- Ahmed
- Language
- EN