Skip to content

Opening book details…

Can I read Mistri Khola Hydropower Water Filling Procedure on EtoBox?

Mistri Khola Hydropower Water Filling Procedure by Saransh Mool is a document available to read on EtoBox.

What is Mistri Khola Hydropower Water Filling Procedure about?

The document provides procedures for the initial water filling test of the penstock pipes for the 42MW Mistri Khola Hydroelectric Project in Myagdi, Nepal. It outlines several important steps to follow, including performing the initial water filling under slow, controlled conditions; completing inspections and equipment testing before water filling; monitoring the system during filling; allowing time for soaking and inspection after full filling; and using maximum dewatering rates of no more than 50% of air

Author
Saransh Mool
Language
EN