This report describes the design of a four-leg catenary anchor leg mooring and capsule buoy system for direct pump-out of Corps of Engineers hopper dredges. Key aspects of the design include a 28-foot long buoy that can be transported by truck, 600-foot long anchor chains, and structural, stability, and piping analyses. The report estimates the buoy can be assembled by 5 people and installed by 4 people in 1 week or less using a 50-60 ton crane.