Commissioning Results IG 2 by pankajkalsariya.920 is a document available to read on EtoBox.

The document details the commissioning test results for a new CGPISL make breaker installed at the 220 kV Dahej Indogulf line 2. Key measurements include insulation resistance, contact resistance, circuit breaker timing, and SF6 gas purity, all indicating satisfactory performance. The tests were conducted on October 11, 2025, for a breaker manufactured in 2024.