About this document
Pipeline 3: Shelter to Reject Tank by hanyacahyo is a document available to read on EtoBox.
The document contains technical details about a pipeline project for the EPC Water Treatment Plant at New Town Site. It includes measurements such as total pipe length, distances between points, and coordinates for various benchmark points. The information is presented in a structured format with elevation levels and a graphic scale for reference.
- Author
- hanyacahyo
- Language
- EN