HVAC Cable Routing Diagram Update by Ashraf M is a document available to read on EtoBox.

The document discusses laying HVAC cables from a distribution board to the roof of a building. It specifies that the cable should be laid below the floor at elevation 100.190 in an existing tray, then rise up at one location to a new tray at elevation 100.240 using airmech supports. The new tray will cross a fence and come outside the cellar area to avoid an existing switch and light fixture.