Skip to content

Opening book details…

About this document

El Azzel Water Isolation Workover Plan by IWCF IADC is a document available to read on EtoBox.

The document outlines the proposed completion schematic for the Water Isolation Workover at El Azzel #1 by Pioneer Natural Resources Tunisia, Ltd. It details the wellbore configuration, including various casing sizes, depths, and equipment such as gas lift mandrels and packers. The total depth of the well is specified as 3,740 m MD/TVD.

Author
IWCF IADC
Language
EN