Opening book details…
Can I read PCC Work Qun. 09.02 on EtoBox?
PCC Work Qun. 09.02 by souravgolui49 is a document available to read on EtoBox.
What is PCC Work Qun. 09.02 about?
The document details the quantities of PCC work required for various rooms and walkways, including dimensions and calculated volumes. A total volume of 15.9 m3 is listed before deductions, with a deduction of 0.576 m3 for washrooms. After deductions, the total volume required is 15.324 m3.
- Author
- souravgolui49
- Language
- EN