About this document
Pipe CB III Development Plan by Rita Suryani is a document available to read on EtoBox.
The document outlines the specifications for the new pipe installation project CB III, detailing entry and exit points with their respective coordinates. It is part of the Pengembangan Pipa CB-III project managed by Pertamina, with KSO Hutama Karya – Timas Suplindo as the contractor. The drawing includes various sections and references to existing pipes and infrastructure.
- Author
- Rita Suryani
- Language
- EN