Can I read Construction Project Cost Breakdown on EtoBox?

Construction Project Cost Breakdown by John Lancer Fabob is a document available to read on EtoBox.

What is Construction Project Cost Breakdown about?

The document outlines the man-days and associated costs for various trades needed to complete a construction project. It lists 68 man-days for engineers and 3 man-days for surveyors, with their daily rates and total costs. It then provides a breakdown of man-days needed by trade for each phase of work, such as excavation, foundation, slabs, walls, and finishing. The totals at the bottom indicate it will require 34 operators, 634 laborers, 270 steel-men, 151 carpenters, and other trades to complete the work

Author
John Lancer Fabob
Language
EN