Can I read 115 kV GIS Design for Service Continuity on EtoBox?

115 kV GIS Design for Service Continuity by lkt_pestech is a document available to read on EtoBox.

What is 115 kV GIS Design for Service Continuity about?

The document discusses the design criteria for a 115 kV Gas Insulated Substation (GIS) by the Electricity Generating Authority of Thailand (EGAT) to enhance service continuity and safety during maintenance. It emphasizes the advantages of GIS, including high reliability and compactness, and outlines specific design modifications such as the addition of gas buffer compartments and disconnecting switches to minimize service interruptions. The paper also details the service continuity criteria established by E

Author
lkt_pestech
Language
EN

More by lkt_pestech