Skip to content

Opening book details…

Can I read Mini Hydro Project Equipment Specs on EtoBox?

Mini Hydro Project Equipment Specs by researchdit is a document available to read on EtoBox.

What is Mini Hydro Project Equipment Specs about?

This document provides specifications for 3 mini hydro power project demo sites in Tanzania including site location details, grid references, operation details, hydraulic conditions, proposed machine configuration, and other relevant details. Key information includes the Tandala/Ijangala project located in Makete, Njombe with a gross head of 20m, available flow rate of 4.2 m3/s and Francis turbine selection. The Mpando project is located in Imalinyi, Njombe with a gross head of 17m and 2.4 m3/s flow rate. T

Author
researchdit
Language
EN