Skip to content

Opening book details…

Can I read Volume Perhitungan Gorong-Gorong 2011 on EtoBox?

Volume Perhitungan Gorong-Gorong 2011 by Mohamad Hartadi is a document available to read on EtoBox.

What is Volume Perhitungan Gorong-Gorong 2011 about?

This document contains calculations of volumes and a cost estimate for excavation work in 2011. It includes calculations of volumes for excavated earth, stone mixtures, plastering, concrete, reinforcement bar and other materials. It then provides a budget plan with itemized costs for excavation, stonework, plastering, painting, concrete, framing, rebar and landscaping. The total estimated cost is 19 million rupiah for the drain and slope construction work.

Author
Mohamad Hartadi
Language
EN