About this document
Bridge Construction Drawing Overview by Dhilip Kumar is a document available to read on EtoBox.
The document discusses the replacement of an existing bridge at kilometer 0.844 with a new bridge. The existing bridge is a single box culvert structure that is 1.8 meters wide. The proposed new bridge will be a reinforced concrete box structure that is 1.8 meters wide with a total clear height of 2 meters. The existing rail level at the site is 756.319 meters while the proposed new rail level will be 755.856 meters.
- Author
- Dhilip Kumar
- Language
- EN