About this document
Fill Height and Settlement Analysis by Kamal is a document available to read on EtoBox.
The document contains data from an instrument measuring fill height and settlement over time for a design segment. The fill height increases over time as more material is added, reaching a maximum of around 21 feet. Meanwhile, the surface settles slowly at first and then at an increasing rate as the load increases, resulting in around 2.5 feet of settlement after several hundred days. A graph shows the fill height increasing while the settlement depth grows over time in an approximately inverse relationship
- Author
- Kamal
- Language
- EN