About this document
Incident Report: Floor Drain Relocation by mohmansy83 is a document available to read on EtoBox.
This incident notification report details a relocation of a floor drain at a proposed residential building project by Conversion Electromechanical Co. LLC. The incident occurred on June 17, 2025, due to a lack of attention from the main contractor, resulting in additional costs and rework. Witnessed by Mechanical Engineer Mohamed Youssif, the report includes attached photos for reference.
- Author
- mohmansy83
- Language
- EN