Skip to content

Opening book details…

About this document

Bamboo-1X Morning Drilling Report by Mohamed Hashem is a document available to read on EtoBox.

The Morning Drilling Report for the Bamboo-1X well in Egypt details drilling operations conducted on May 14, 2010, including drilling progress to a depth of 3248 m and the use of an 8 1/2" bit. The report highlights increased mud weight, circulation operations, and safety measures, with no incidents reported. The total cumulative cost to date is approximately $35.4 million, with daily costs of $299,790.

Author
Mohamed Hashem
Language
EN