About this document
Welleh Diversion Weir Project Report by yibabieadimas23 is a document available to read on EtoBox.
The Welleh Diversion Weir Water Supply Project aims to provide sustainable potable water to Sekota Town and surrounding areas in the Amhara Region of Ethiopia. The project includes detailed engineering design and feasibility studies, focusing on hydrology, structural design, and cost estimation to address the severe water shortage in the region. The total estimated cost for the project is approximately 49.43 million Ethiopian Birr, which includes various construction and installation components.
- Author
- yibabieadimas23
- Language
- EN