Skip to content

Opening book details…

Can I read Key Architectural Acronyms Explained on EtoBox?

Key Architectural Acronyms Explained by Melissa Ann Patano is a document available to read on EtoBox.

What is Key Architectural Acronyms Explained about?

The document defines various acronyms related to site development controls including total lot area (TLA), building height limit (BHL), floor area ratio (FLAR), gross floor area (GFA), total gross floor area (TGFA), percentage of site occupancy (PSO), maximum allowable construction area (MACA), unpaved surface area (USA), impervious surface area (ISA), open space within lot (OSL), total open space within lot (TOSL), allowable maximum building footprint (AMBF), and allowable maximum volume of building (AMVB)

Author
Melissa Ann Patano
Language
EN

More by Melissa Ann Patano

Browse all works by Melissa Ann Patano