About this document
McDonald by awis_aziz is a document available to read on EtoBox.
This document describes a production process and two trials to improve it. It includes: - A chart showing the original production process with operators and steps. - Details on rebalancing the line and changing standard operating procedures in the first trial, which reduced the cycle time from 14 to 11 minutes. - A second trial that further rebalanced the line and changed SOPs, reducing the cycle time to 7 minutes. The document analyzes efforts to level production and continuously improve efficiency.
- Author
- awis_aziz
- Language
- EN