Skip to content

Opening book details…

About this document

Updated Pile Load Calculations 2025 by Mohammed Al-Feky is a document available to read on EtoBox.

The document presents new calculations for load limits on abutment and pier piles, detailing service, strength, and extreme limit states. Modifications include adjusting the EV load based on the slope of the embankment and increasing the number of piles from 16 to 20 for both abutments and the pier, with revised spacing of 3x3m. The heights considered for the abutment column are 8.392m on the back side and an average of 4.45m on the front side.

Author
Mohammed Al-Feky
Language
EN