About this document
Bugiri Final Drilling Report RPT 2024 by bazanyanengorobert is a document available to read on EtoBox.
The document is a final report on the Bukiri Town Council Water Supply and Sanitation Project, detailing the inception study, hydro-geological surveys, drilling, and water quality analysis for a production borehole in Bukiri Village, Bugiri District. It outlines the methodology, findings, and recommendations for the borehole construction, which was successfully completed with a yield of 3.09m3/hr. The report emphasizes the importance of the borehole for providing groundwater to support a solar-powered water
- Author
- bazanyanengorobert
- Language
- EN