Daily Progress Report: Orange Line Metro by Engr Saeed Anwar is a document available to read on EtoBox.

What is Daily Progress Report: Orange Line Metro about?

This daily progress report from the Orange Line Metro Train Project in Lahore summarizes the status of fabrication for 65 rail components. It lists each component, the quantities complete for fitup, fabrication, sand blasting, painting, and dispatch. All components are reported as "ok" or complete for the stages of fitup and fabrication. The report was prepared by Muhammad Rashid, the QA/QC Inspector, for contractor Akhter Engg on an unspecified date in 2017.