This document is a fit-up inspection report for work done on Tank T-10. It details 8 joints of rafters that were fitted and welded from June 10-11, 2017 using SMAW welding. All joints passed inspection. A second page details another 8 rafter joints from the same time period that also passed inspection. The third page is for a bottom sump joint fitted on June 30, 2017 that passed inspection. The fourth page is for a roof manhole neck to flange joint fitted on August 8, 2017 that also passed inspection. All j