Hydraulic Structure Sizing at PK 17+088 by ScribdTranslations is a document available to read on EtoBox.

This report presents the hydraulic calculation and structural sizing of a structure with a section of 4 x (3.00 x 3.00) located at PK 17+088 as part of the construction of the Sabou - Koudougou - Didyr road. The hydraulic verification confirmed that the section is adequate for flow, while the sizing allowed for the determination of the minimum steel sections required. The total cost of the works is estimated at approximately 554,651.07 CFA, or 115,107 USD excluding taxes.