Can I read Replacement of 34.5 kV Switchgear Project on EtoBox?
Replacement of 34.5 kV Switchgear Project by nestbulala is a document available to read on EtoBox.
What is Replacement of 34.5 kV Switchgear Project about?
The document is a project drawing prepared by Mikail Dündar for the replacement of a 34.5 KV switchgear for the National Water Company (NWC). It includes details about the project team and contact information for EuroPower Enerji ve Otomasyon Teknolojileri Sanayi Ticaret A.Ş. The document is dated April 21, 2014, and includes a responsibility matrix and revision information.
- Author
- nestbulala
- Language
- EN