Opening book details…
Can I read DMR N°25 - MDZ838 - F-28 - 27-02-2026 on EtoBox?
DMR N°25 - MDZ838 - F-28 - 27-02-2026 by azzouzwalid is a document available to read on EtoBox.
What is DMR N°25 - MDZ838 - F-28 - 27-02-2026 about?
The Daily Drilling Fluid Report for well MDZ-838 on 27/02/2026 details drilling operations using an oil-based mud system with a spud date of 03/02/2026. Key metrics include a flow rate of 2,678 l/min, a total depth of 2,770 m, and a cumulative well cost of 426,734.66 USD. Recommendations include maintaining mud properties and treating the active system to improve performance.
- Author
- azzouzwalid
- Language
- EN