Can I read Outline Design (Phase 2) on EtoBox?
Outline Design (Phase 2) by Mirna Yousry is a document available to read on EtoBox.
What is Outline Design (Phase 2) about?
Chapter 5 outlines the design for Phase 2 of the Greater Cairo Metro Line No. 4, focusing on the northern route from El Malek El Saleh to Ring Road Exit #18. It details the alignment plan, design criteria, and considerations for station locations while addressing control points and archaeological concerns. The proposed route spans 17.6 km with 16 stations, including both underground and elevated sections, while prioritizing minimal disruption to existing structures and cultural heritage.
- Author
- Mirna Yousry
- Language
- EN