Opening book details…
About this Engineering article
Design and installation of large diameter subsea connecting shafts for the seabrook station cooling water system : Hulshizer, A J; Nossereau, J P Proc 5th Rapid Excavation and Tunneling Conference, San Francisco, 3–7 May 198, V2, P902–929. Publ New York: AIME, 1981 is a Engineering article available to read on EtoBox.
It is typically read by researchers, students, and practitioners in Engineering.
- Publisher
- Elsevier Science; Elsevier ; Pergamon Press Ltd.; Elsevier BV (ISSN 0148-9062)
- Published
- 1982
- Field
- Engineering (Physical Sciences)