Skip to content

Opening book details…

About this Engineering article

Design and installation of large diameter subsea connecting shafts for the seabrook station cooling water system : Hulshizer, A J; Nossereau, J P Proc 5th Rapid Excavation and Tunneling Conference, San Francisco, 3–7 May 198, V2, P902–929. Publ New York: AIME, 1981 is a Engineering article available to read on EtoBox.

It is typically read by researchers, students, and practitioners in Engineering.

Publisher
Elsevier Science; Elsevier ; Pergamon Press Ltd.; Elsevier BV (ISSN 0148-9062)
Published
1982
Field
Engineering (Physical Sciences)