About this document
Telok Gong Pipeline Installation Procedure by john is a document available to read on EtoBox.
This document provides procedures for pipeline installation at hilly areas for the Telok Gong Loop Pipeline Project in Melaka, Malaysia. It was prepared by AxiaEnergy (M) Sdn Bhd for Petronas Gas Berhad. The document outlines safety, environmental, regulatory and responsibility requirements. It also describes the equipment and manpower needed, including responsibilities of the supervisor, surveyor, safety supervisor, welding inspector, excavator operator, and other roles. Procedures are provided for pipel
- Author
- john
- Language
- EN