About this document
Mechanical Dialy Report: El Wastani Field by taher is a document available to read on EtoBox.
The mechanical dialy report summarizes the status of equipment at the El Wastani Field. Phase II equipment including gas compressors K-402, K-403, K-404, and K-405 are operational with no issues, while K-401 is on standby. Air compressors and generators are also available with daily checks showing no problems. For Phase III, MRU-I propane compressors A and B are online while C is on standby. The stabilizer overhead compressor and generators are available as well. Air compressors are also mentioned but no st
- Author
- taher
- Language
- EN