Skip to content

Opening book details…

Can I read Scheduling Problems with Two Competing Agents to Minimize Minmax and Minsum Earliness Measures on EtoBox?

Scheduling Problems with Two Competing Agents to Minimize Minmax and Minsum Earliness Measures by Baruch Mor; Gur Mosheiov is a Engineering article available to read on EtoBox.

What is Scheduling Problems with Two Competing Agents to Minimize Minmax and Minsum Earliness Measures about?

A relatively new class of scheduling problems consists of multiple agents who compete on the use of a common processor. We focus in this paper on a two-agent setting. Each of the agents has a set of jobs to be processed on the same processor, and each of the agents wants to minimize a measure which depends on the completion times of its own jobs. The goal is to schedule the jobs such that the combined schedule performs well with respect to the measures of both agents. We consider measures of minmax and minsum earliness. Specifically, we focus on minimizing maximum earliness cost or total (weighted) earliness cost of one agent, subject to an upper bound on the maximum earliness cost of the other agent. We introduce a polynomial-time solution for the minmax problem, and prove NP-hardness for the weighted minsum case. The unweighted minsum problem is shown to have a polynomial-time solution.

Who reads Scheduling Problems with Two Competing Agents to Minimize Minmax and Minsum Earliness Measures?

It is typically read by researchers, students, and practitioners in Engineering.

Author
Baruch Mor; Gur Mosheiov
Publisher
Elsevier Science; Elsevier ; Elsevier BV (ISSN 0377-2217)
Published
2010
Language
EN
Field
Engineering (Physical Sciences)

More by Baruch Mor; Gur Mosheiov

Browse all works by Baruch Mor; Gur Mosheiov