Skip to content

Opening book details…

About this document

Rooftop PV System Feasibility in Bangladesh by aryanyuen2 is a document available to read on EtoBox.

This paper analyzes the feasibility of a rooftop photovoltaic system for an academic building in Bangladesh, focusing on four different configurations (46 kW, 64 kW, 91 kW, and 238 kW). The 91 kW system was determined to be the most optimized, with a total net present cost of $146,317, a cost of energy of $0.0385, an internal rate of return of 120.3%, and a payback period of 8.3 years. Additionally, this system is projected to reduce CO2 emissions by 90,010 kg/year.

Author
aryanyuen2
Language
EN