Phase 1 Exploration Program Budget Breakdown by faidol is a document available to read on EtoBox.
What is Phase 1 Exploration Program Budget Breakdown about?
The document outlines a Phase 1 exploration program that includes satellite image analysis, sampling of surface dumps and soils, geological surface mapping and data collection, and a final report. The program will be conducted over 45 days with a Mexican team and costs a total of $124,120 CAD, which includes labor, equipment rental, sample analysis, and taxes.