Skip to content

Opening book details…

About this document

3L06-Technical Clarification For NC5 Station Ground Level Equipment Foundation by bishoymakram77 is a document available to read on EtoBox.

The document outlines design clarifications for the NC5 Station Ground Level Equipment foundations as part of the 10th of Ramadan Railway Project. It details the locations and specifications of various equipment foundations, including adjustments to foundation heights and dimensions for specific pumps, along with references to relevant drawings. Important notes emphasize the need for the civil subcontractor to clarify any unspecified foundations based on the E&M systems

Author
bishoymakram77
Language
EN