FPSO Crane Installation Efficiency by g665013 is a document available to read on EtoBox.

1) Mammoet was tasked with installing modules on two FPSO vessels being constructed in a narrow quay in Rio Grande, Brazil, with over 25 large components weighing up to 1,700 tons needing to be lifted. 2) A single Mammoet PTC-200 DS crane was used for the entire installation as it could perform all lifts from one position on the quay, avoiding safety risks and delays from moving smaller cranes around. 3) The PTC-200 DS crane completed the entire installation from its single position, placing 20 modules,