About this document
Kajun Rig Workover Case Study Analysis by Elias David is a document available to read on EtoBox.
The case study discusses the re-entry attempt of the Kajun Rig in Pine Prairie, LA, originally drilled in 1971, now considered economically feasible due to increased oil prices. The current operation faces challenges with junk mills getting stuck and showing wear due to debris and poor cementing. The document poses questions regarding alternative milling strategies, improvements to the bottom hole assembly, and potential issues with switching to a taper mill.
- Author
- Elias David
- Language
- EN