Skip to content

Opening book details…

About this document

HDD Method for Pipeline Installation by muhammedpmubarak is a document available to read on EtoBox.

This document summarizes a research paper about installing pipelines using the horizontal directional drilling (HDD) method. The HDD method involves 3 stages: 1) drilling a small diameter pilot hole along the design path, 2) enlarging the pilot hole to install the pipeline, and 3) pulling the pipeline back through the enlarged hole. There are risks associated with HDD including failures during pilot boring/reaming, ground collapse, and failures during the pullback process. The document analyzes the HDD meth

Author
muhammedpmubarak
Language
EN