Opening book details…
Can I read BHDC-123 Well Control Drill Summary on EtoBox?
BHDC-123 Well Control Drill Summary by 120313488 is a document available to read on EtoBox.
What is BHDC-123 Well Control Drill Summary about?
On January 3, 2025, a well control drill was conducted on rig BHDC-123 at location FQ-6, led by Li Tao, the DOD HSE Supervisor. The drill involved installing a safety valve and closing the BOP annular, with positive observations including quick response to the kick indicator and crew awareness of responsibilities, while negative observations noted delays in mustering and a lack of checks on the koomey unit valve. The drill emphasized the importance of safety rules as essential tools for the crew.
- Author
- 120313488
- Language
- EN