Skip to content

Opening book details…

Can I read SSE/SIG/BXN Disconnection Plan on EtoBox?

SSE/SIG/BXN Disconnection Plan by Bharat Singh is a document available to read on EtoBox.

What is SSE/SIG/BXN Disconnection Plan about?

The document outlines a disconnection plan for various stations on the MTJ-GGC line scheduled for 20/02/2025, detailing the required gear and staffing needs. Maintenance work is planned for both corridor and non-corridor directions, with specified durations for each task. Notifications must be sent to SI Control in advance by 16:00 hours.

Author
Bharat Singh
Language
EN

More by Bharat Singh

Browse all works by Bharat Singh